Modern conveniences

BT OpenReach engineer hooking up our phone line.

BT OpenReach engineer hooking up our phone line.

When we moved onto site to start the foundations, we had no electricity, internet, or running water. We did have mains water to the site, but it required two people to fill up a 5 litre bottle – one to wrestle the 32mm supply pipe into the bottle, and the other to turn on the toby1, which is the main valve controlling the supply of water to our property. All cooking (and heating of water) had to be done over a fire. This was fun at times, but challenging at others (especially when it starts snowing early in the morning and we had not sorted dry tinder the night before). Charging mobile phones and computers or accessing the internet required a 300m walk to Wiston Lodge (who have kindly allowed us to use theirs). This might not sound like a big deal, but when you need to check something quickly or send an email in the middle of building works, it can be quite problematic. Continue reading


  1. Called a mains stopcock outside of Scotland – don’t ask me where ‘toby’ came from.